工程专业优秀英文自我评价

工程专业人员只有当自己也沉淀下来,窥探自己的内心, 今天小编就给大家分享一下英文的自我评价,欢迎来参考

有关工程英文自我评价

First, the construction quality inspection summary

1, XX February 17 to the company after the meeting will be completed in accordance with the requirements of the company to check the Shenzhen Vanke Qian Lin Shanju project, Guangzhou Conghua Xia Wan to take the project to check the project technical documents, construction programs, construction quality, construction safety, The whole construction production system, the inspection of the quality problems, security risks, production points have been made to make a comprehensive reform measures and technical control methods, and check the existence of the sub-project technical information reported to the company.

2, according to the examination of the problems I have done the relevant rectification and technical disclosure, and technical delivery to the foreman under the hands of the Secretary, and cut the requirements of the main management personnel in accordance with relevant technical information to control the implementation of the project quality control in the implementation process Because the management system does not build the leadership does not attach great importance to the quality of the project, not at all levels of implementation, so the implementation of the original grid is not in accordance with the relevant technical specifications data implementation, there is no implementation of the reasons for the analysis;

A, in accordance with the current project construction in the quality, and safety issues to further analyze the quality of the project is the life, an enterprise should be quality first, safety first as the goal. First of all, the company's leadership on the quality of the project has not been a high degree of attention, the company did not develop a clear project quality management objectives, safety management objectives, there is no clear and feasible quality, safety control measures, and no uniform control objectives, A sub-project in the construction process will not be effectively controlled. B, the project quality management is the biggest flaw is not doing a good job targeted technical control of the book, senior management of the sub-project quality management objectives are not clear, security management is not clear, not to mention there are What to guide the effective control of technical documents, volatility and randomness are relatively large, according to the inspection results can reflect the pre-implementation process, sub-project construction is basically based on the discretion of the foreman to command operations, regardless of technical level , Not in accordance with the relevant regulatory requirements to make effective control of the relevant documents.

C, good technical disclosure is one of the conditions to effectively control the quality of the project, to this end, each sub-project should be carried out before the implementation of the end, operating technology, Program, is the process of construction of specific guidance documents, good technical first of all project managers should attach great importance to, and must be clear to the end of the content, including construction methods, quality requirements and acceptance criteria, the construction process should pay attention to issues that may arise Unexpected problems and emergency measures. Key parts, or technical difficulties, the construction of complex sub-projects, do not do a good job at the end of technical sub-project, shall not enter the formal implementation.

Second, the production and quality management overview

1, the construction project is a production of a single, liquidity, large fluctuations, it is not like the general industrial products as the production line so standardized, a fixed production lines, a standardized production technology and improve the detection technology, Of the production equipment and stable production environment, so the project quality is easy to produce fluctuations and fluctuations are still relatively large, while affecting the quality of the project is still more factors, any of which factors change, will make the project quality fluctuations. Such as the use of material specifications varieties of errors, improper construction methods, the operation did not follow procedures, mechanical equipment failure, design errors, the production system construction environment, and so will cause the project quality accident. A major factor is the human factor, according to my company is currently under construction projects, the existence of quality problems, and the vast majority of security risks caused by human factors of quality and safety issues, the total summed up in five , Human factors, material factors, mechanical factors, construction methods, construction environment five factors.

2, personnel factors, people are the main production and operation activities, but also the construction of the project decision-makers, managers, operators, the whole process of project construction, such as project planning, decision-making, surveying, design and construction, To complete. The quality of personnel, that is, people's cultural level, technical level, decision-making ability, management ability, work ability, control ability, physical quality and professional ethics, will directly affect the quality of construction, so the personnel factor is an important impact on project quality factor. Therefore, it is necessary to strengthen the management of their own management quality, improve the quality and safety of management quality, first of all from the leadership to start from the leadership.

工程英文自我评价范文

XX years to participate in the work to XX April has been in Beijing Construction Engineering Construction Engineering Company Limited, a project of any technical work. Mainly to participate in bidding, writing programs and to the end, drawing on-site construction plans, do negotiations, and supervision, Party to deal with, as the completion of plans and so on. XX in April so far in the construction of an electronic plant in the field of civil engineers (Party on-site representatives). I have been involved in the work for nearly 20 years, working in the construction field for many years, from the initial maintenance, building leakage to the supervision of high-level decoration, high-rise buildings, municipal roads, bridges and so can be described as experienced, , Project deputy manager, project director, project director and other duties. From the grass-roots level to the management to bear the heavy work pressure.

I am well aware that only with excellent professional skills, good communication skills and team spirit, in order to effectively carry out their work. At the same time I also use their spare time to actively improve themselves, completed undergraduate self (project management), also successfully passed the two construction division (housing construction, decoration) to test. I am eager to have more room for development in the new environment. Has also been in the Beijing Construction Engineering Group, the construction company for nearly 20 years, long-term engineering projects as chief engineer and project manager, which has served more than 20 million square meters of project total work, and more than 10 million square meters of project Manager, has a wealth of practical experience in construction. Work enthusiasm and initiative, with good interpersonal skills.

关于工程英文自我评价

The University is a place where I can really grow up. "The university not only taught me the real skills, but more importantly, taught me how to learn and how to look at things in the world in the right and unique way I think this is a better foundation for the creation of the world.

I really do what you like and is a good thing in the study, in addition to poor English, the other is very good, sophomore two semesters I am also familiar with the operation of office software. There autocad is also very familiar with (took a high card) .In addition to these "business", the amateur I still continue to enrich and improve themselves. A college radio station to do a director and then do vice minister of photography to do radio station deputy stationmaster, along the way I am in my ability to continue to climb in this process also learned a lot of knowledge, such as interpersonal, organizational management - - more importantly, I know what is the responsibility! I am very interested in literature and art, leisure time often as entertainment to study, so writing, sketches, photography, also have a certain ability to control.

I can not get a good car behind closed doors reason I know - the university I can seize all the opportunities to go out to social work.University summer school I organized a "three rural" reservoir safety research activities, experience in the heat Summer job I have seized the opportunity to do two "summer internship" - one for the Fan Yu a drafting company designed to do a month; Second, the Provincial Water Conservancy Research Institute to do Model construction. These work experience makes me more mature, ready to enter the community. Also, I personally although the body is smaller, but the physical condition is good. For the good and easy. I often give myself to wear such a top Hat: "pragmatic idealist"! Because to achieve the ideal must be pragmatic.

Although my student life is about to end, but my learning career is like the responsibility of the construction project is a life-long system.


工程专业优秀英文自我评价相关文章:

1.机械专业优秀英文自我评价

2.关于英文自我评价优秀范文

3.最新自我评价英文优秀范文

4.英文简历里的自我评价

5.英文版的自我评价简历

工程专业优秀英文自我评价

下载Word文档到电脑,方便收藏和打印~

下载Word文档

带你看艺考
艺考信息时光机

新疆艺术学院2022年普通本科艺术类专业考试成绩复核结果公示

新疆艺术学院2022年普通本科艺术类专业考试成绩复核结果公示
新疆艺术学院
艺术类专业成绩查询新疆艺术学院2022/4/23

四川师范大学2022年普通高等教育本科招生章程

四川师范大学2022年普通高等教育本科招生章程
四川师范大学
普通类招生章程四川师范大学2022/4/23

汉江师范学院2022年湖北省书法学专业成绩查询

汉江师范学院2022年湖北省书法学专业成绩查询
汉江师范学院
艺术类专业成绩查询汉江师范学院2022/4/23

关于划定2022年汉江师范学院湖北省书法学专业合格分数线的公告

关于划定2022年汉江师范学院湖北省书法学专业合格分数线的公告
汉江师范学院
艺术类专业分数线汉江师范学院2022/4/23

江苏2022年高校专项计划报名4月25日截止

江苏:2022年高校专项计划报名4月25日截止
江苏:2022年高校专项计划报名4月25日截止江苏:2022年高校专项计划报名4月25日截止江苏:2022年高校专项计划报名4月25日截止江苏:2022年高校专项计划报名4月25日截止
江苏高考招生资讯江苏:2022年高校专项计划报名4月25日截止2022/4/23

四川省教育考试院建议:高考前,要为志愿填报做这些准备

四川省教育考试院建议:高考前,要为志愿填报做这些准备
四川省教育考试院建议:高考前,要为志愿填报做这些准备
四川高考招生资讯四川省教育考试院建议:高考前,要为志愿填报做这些准备2022/4/23

广西2022年普通高等学校运动训练、武术与民族传统体育专业招生文化考试圆满结束

广西:2022年普通高等学校运动训练、武术与民族传统体育专业招生文化考试圆满结束
广西:2022年普通高等学校运动训练、武术与民族传统体育专业招生文化考试圆满结束
广西高考招生资讯广西:2022年普通高等学校运动训练、武术与民族传统体育专业招生文化考试圆满结束2022/4/23

辽宁2022年普通高等学校体育类专业招生工作实施办法

辽宁:2022年普通高等学校体育类专业招生工作实施办法
辽宁:2022年普通高等学校体育类专业招生工作实施办法
辽宁高考招生资讯辽宁:2022年普通高等学校体育类专业招生工作实施办法2022/4/23

江苏2022年普通高校招生体育类专业省统考考生健康应试须知

江苏:2022年普通高校招生体育类专业省统考考生健康应试须知
江苏:2022年普通高校招生体育类专业省统考考生健康应试须知
江苏高考招生资讯江苏:2022年普通高校招生体育类专业省统考考生健康应试须知2022/4/23

西藏2022年普通高等学校招生规定

西藏:2022年普通高等学校招生规定
西藏:2022年普通高等学校招生规定西藏:2022年普通高等学校招生规定西藏:2022年普通高等学校招生规定西藏:2022年普通高等学校招生规定
西藏高考招生资讯西藏:2022年普通高等学校招生规定2022/4/23

内蒙古2021-2022学年第二学期全区普通高中学业水平考试考前温馨提示

内蒙古:2021-2022学年第二学期全区普通高中学业水平考试考前温馨提示
内蒙古:2021-2022学年第二学期全区普通高中学业水平考试考前温馨提示
内蒙古高考招生资讯内蒙古:2021-2022学年第二学期全区普通高中学业水平考试考前温馨提示2022/4/23

宁夏2022年高职分类招生职业技能测试时间的通告

宁夏:关于我区高职分类招生职业技能测试时间的通告
宁夏:关于我区高职分类招生职业技能测试时间的通告
宁夏高考招生资讯宁夏:关于我区高职分类招生职业技能测试时间的通告2022/4/23

全国31省开设艺术类专业的院校有哪些?

全国31省开设艺术类专业的院校有哪些?
开设艺术类专业的院校开设艺术类专业的院校开设艺术类专业的院校开设艺术类专业的院校
2022艺考开设艺术类专业的院校2022/4/23

清华大学美术学院2022本科校考考题公布(附各美院真题)

清华大学美术学院2022本科校考考题公布(附各美院真题)
艺术类专业考题清华大学美术学院2022/4/23

即将执行!戏剧、影视、舞蹈等艺术课程融入义务教育阶段

​4月21日,据教育部消息,2022年新修订的《义务教育课程方案》和语文等16个《课程标准》正式发布,将对教与学的内容、方式等进行改革,注重对实际问题的有效回应,强调加强学段衔接。
戏剧、影视、舞蹈等艺术课程融入义务教育阶段戏剧、影视、舞蹈等艺术课程融入义务教育阶段戏剧、影视、舞蹈等艺术课程融入义务教育阶段戏剧、影视、舞蹈等艺术课程融入义务教育阶段
2022艺考戏剧、影视、舞蹈等艺术课程融入义务教育阶段2022/4/23

四川电影电视学院2022年校考专业考试结果查询的通知

四川电影电视学院2022年校考专业考试结果查询的通知
四川电影电视学院
艺术类专业成绩查询四川电影电视学院2022/4/23

上海大学音乐学院2022年音乐表演专业校考复试(线上考试)操作流程

上海大学音乐学院2022年音乐表演专业校考复试(线上考试)操作流程
上海大学
艺术类招生简章上海大学2022/4/23

上海大学音乐学院2022年音乐表演专业校考复试(线上考试)考生须知

上海大学音乐学院2022年音乐表演专业校考复试(线上考试)考生须知
上海大学
艺术类招生简章上海大学2022/4/23

关于上海大学音乐学院2022年音乐表演专业校考复试(线上考试)工作安排的公告

关于上海大学音乐学院2022年音乐表演专业校考复试(线上考试)工作安排的公告-上海大学本科招生网
上海大学
艺术类招生简章上海大学2022/4/23

2022年西安体育学院艺术类招生专业课校考合格线

2022年西安体育学院艺术类招生专业课校考合格线
西安体育学院
艺术类专业分数线西安体育学院2022/4/23
没有更多了?去看看其它艺考内容吧

艺考热搜

艺考数据
艺考资源站

  • 艺考分数线
  • 艺考简章